WIN
is committed to be low cost and fast turn around for
our customers in best quality. The standard production
cycle time has been established as following based on
our past performance. The short cycle time and on time
delivery is achieved by the control of CIM and SPC system.
Computer
Integrated Manufacturing (CIM)
Real time shop floor management ¡V planning,
scheduling, dispatching, and reporting
Data collection and integration, on-line
SPC
Fab/Equipment automation
Statistical
Process Control (SPC)
Automatic rule checking and violation detection
Statistical data analysis for control limit
and process capability
Routine SPC review for process control and improvement