WIN
is committed to low cost, fast turn around for our customers
in best quality. The standard production cycle time
has been established as following based on our past
performance. The short cycle time and on time delivery
is achieved by the control of CIM and SPC system.
Computer
Integrated Manufacturing (CIM)
Real time shop floor management ¡V planning,
scheduling, dispatching, and reporting
Data collection and integration, on-line
SPC
Fab/Equipment automation
Statistical
Process Control (SPC)
Automatic rule checking and violation detection
Statistical data analysis for control limit
and process capability